SPECIFICATIONS
STRUCTURE
RCC framed structure. Designed for seismic zone – III. Multi- storied
building with stilt + 9 floors. Solid blocks for walls with cement
plastering.
FLOOR FINISHING AT
Living & Dining : Vitrified tiles (2’ x 2’)
Bed rooms : Ceramic tiles (20” x 20”)
Kitchen : Ceramic tiles (20” x 20”)
Balcony : Anti skid ceramic tiles
WALL FINISHING AT
Toilets : Colour glazed ceramic tiles from floor to 7’ height in shower
area and floor to 4’ height in other areas
Above kitchen platform : Colour – Glazed tiles dado upto 2’ height.
Utility : Colour – Glazed tiles upto 3’ height to the required area
Kitchen platform : Black granite counter with stainless steel sink
PAINT FINISHING AT
Interiors : Oil bound distemper
Exteriors : Cement paint
Ceilings : Cement paint
DOORS, WINDOWS & VENTILATORS
Main door : Teak wood frame with OST flush door, front side
varnished shutter, back side painted with Godrej or equivalent lock
Other doors : Hard wood / Sal wood frame with flush door shutter
painted on both the sides
Windows : UPVC casement windows
Ventilators : UPVC glazed louvers
PLUMBING / SANITARY FITTINGS
Toilets : European closets and wall mounted wash basins – Hindware
or equivalent. EWC includes seat cover and PVC flushing tank
CP fittings : Ess Ess or equivalent
2 in 1 shower will be provided & health faucet for closet
ELECTRICAL
ISI quality cables using copper wiring through PVC conduits
concealed in walls and ceilings

3 Phase connection with independant meter
SWITCHES :
Semi modular switches
ELEVATORS :Two lifts for each Tower
POWER BACK-UP :To connect two light points and two fan points
in the apartment
|