SPECIFICATIONS

STRUCTURE

RCC framed structure. Designed for seismic zone – III. Multi- storied building with stilt + 9 floors. Solid blocks for walls with cement plastering.

FLOOR FINISHING AT

Living & Dining : Vitrified tiles (2’ x 2’)

Bed rooms : Ceramic tiles (20” x 20”)

Kitchen : Ceramic tiles (20” x 20”)

Balcony : Anti skid ceramic tiles

WALL FINISHING AT

Toilets : Colour glazed ceramic tiles from floor to 7’ height in shower area and floor to 4’ height in other areas

Above kitchen platform : Colour – Glazed tiles dado upto 2’ height.

Utility : Colour – Glazed tiles upto 3’ height to the required area

Kitchen platform : Black granite counter with stainless steel sink

PAINT FINISHING AT
Interiors : Oil bound distemper

Exteriors : Cement paint

Ceilings : Cement paint

DOORS, WINDOWS & VENTILATORS
Main door : Teak wood frame with OST flush door, front side varnished shutter, back side painted with Godrej or                  equivalent lock

Other doors : Hard wood / Sal wood frame with flush door shutter painted on both the sides

Windows : UPVC casement windows

Ventilators : UPVC glazed louvers

PLUMBING / SANITARY FITTINGS

Toilets : European closets and wall mounted wash basins – Hindware or equivalent. EWC includes seat cover and             PVC flushing tank

CP fittings : Ess Ess or equivalent

2 in 1 shower will be provided & health faucet for closet

ELECTRICAL

ISI quality cables using copper wiring through PVC conduits concealed in walls and ceilings

3 Phase connection with independant meter

SWITCHES : Semi modular switches

ELEVATORS :Two lifts for each Tower

POWER BACK-UP :To connect two light points and two fan points in the apartment